EMAIL SUPPORTsales@telecontran.com

Course Duration

    Days






Course Objectives

This workshop is a comprehensive 6 day course will be covering the various size of diesel generator, battery bank, charger, AMF, power monitoring, inverters, UPS, standards, including IEC and IEEE as well as best practice. In addition, that course will be included maintenance data log preservation and analysis data for forecast.

This workshop is a highly focused and in-depth training provided by the industry experts along with the relevant updates from the research team.

After successful completion of this 6 day workshop, participants will be able to

  • Understand the working principal of Telecommunications Power operation and maintenance and the global telecom incorporated standards.
  • Understand use of measuring and measuring tools applications and preservation of data.
  • Explain the fundamental concepts of power system equipment and reliable supply and maintenance.
  • Integrate all power system to alarm monitoring system or centralized monitoring system.
  • Learn Standards and best practice as well as case study






Target Audience

This program is designed for professionals who are working in the telecom industry. Management level professionals, technical, non-technical professionals, IT professionals, ICT professionals from Telecom industry, Defense, Banking, Aviation etc. sectors who is interested to have knowledge in basic telecommunications should attend this crash course.







Course Curriculum

Stand By Diesel GeneratorsDiesel engine
  • 2 stroke engine
  • 4 stroke engine
  • Cooling method
    • external cooling
    • Internal cooling
  • External cooling
    • Cooling surface by air
    • Cooling water by radiator
  • Internal Cooling
    • Lube Oil
  • Cylinder Head
    • Exhaust gas valve
    • Air intake valve
  • Manifold
  • Flywheel
  • Crankshaft
  • Rocker arm setting
  • Dynamo
  • Oil cooling pump
  • Coupling
    • Flexible coupling
AC alternator
  • Stator
  • Rotator
  • Single phase and 3 phases
  • Automatic Voltage Regulator






Course Curriculum

Operation Protection
  • Low lube oil pressure
  • Cooling water temperature
  • Exhaust gas temperature
  • Leakage current
  • Overcurrent
Operation Monitoring
  • Lube oil pressure
  • Cooling water temperature
  • Engine speed
  • Energy meter (kW, V, I, Hz)
Inspection
  • Weekly, monthly, 3M, 6M, AnnualData logging
Data analysis
  • Planning for spare parts
  • Replacement schedule






Course Curriculum

VRLA batteries
  • Absorbtion VPC
  • Float VPC
  • Equalize VPC
  • Charging time
  • Impedance measurement
  • Indication panel
  • SMPS Battery chargers
  • Charging time
  • Efficiency
Lightning Protection System
  • Lightning components
    • Rod or air terminal
    • Conductor or cable
    • Ground Rod
  • Lightning protection facts
  • Lightning Do and Don’t
    • Damage to Tower
    • Damage to Appliance
  • Lightning grounding
  • Link resistance
  • Risk assessment






Course Curriculum

Operation AMF Methodology
  • Mechanical Interlock
AMF Panel and RMS Facility
Power Analysis
  • Data analysis
Harmonic Reduction
  • Examples, verify data
Power Factor Correction
  • Auto correction






Course Curriculum

Earthing and grounding
  • Electrostatic Discharge Control
  • Earthling resistance affecting factor
  • Inspection frequency
Air conditioners
  • Determination of heat loss
  • Indoor FCU Determination
  • Outdoor Unit (CU) Determination
  • Fresh and exhaust air flow
UPS
  • USP working methodology
  • 1 phase input and 1 phase output
  • 3 phase input and 3 phase output
  • Capacity and charging time
  • Advantage and efficiency






Course Curriculum

Inverters
  • Inverter working methodology
  • Available features
  • Parameter setting
  • Configuration and wiring
  • Troubleshooting
Other Standards
  • IEC best practice and legislation
  • IEEE standards
  • Past industrial problems and recommended solutions (Videos)
  • Case studies
Audio-Visual Alarm
  • Grouping of alarm
  • Alarm and corresponding remedy
  • Data logging
Monitoring and measuring tools
  • Power analyzer
  • Process calibrator
  • Hard protocol instrument
  • Data log function and report printing

Public Schedule

Training/Workshop
Duration
Training Date
Location
Operations and Maintenance of Telecommunication Power System 5 Days 19th November - 23th November, 2018 Bangkok, Thailand
“Please feel free to contact for any further details at sales@telecontran.com